The next step took the most time, finishing the
room up to make it look pleasant. Painting, flooring, trim, plus a little
acoustic treatment. These shots were taken during final detailing, so
there's still signs of construction everywhere.
Here's a shot of the partially completed mixing desk,
assembled from some Ikea table tops and Home Depot cabinets. I covered the
corner with Auralex Metro foam.

Closeup where you can see 2 Real Traps above the mix desk.

The ceiling is completely covered in OC 703, then covered with
cloth, and finished with some molding. A row of Auralex Metrofusers
finishes off the dropped area of the ceiling along the south wall.

The furnace and hot water heater are now boxed in and behind doors. The
box contains a couple of storage cabinets, several sections of 703
insulation and a panel of Metrofusors.

South East corner filled in with 705 fiberglass.